pipe-jacking project 顶管工程
This paper introduced the pipe jacking technique in the water drainage pipe jacking project for Beijing North West No. 4 Ring Road-University Road Flyover. It has achieved good results.
介绍北京市西北四环路-学院路立交桥排水顶管工程施工技术措施和工艺,施工取得了良好效果。
Glass fibre reinforced plastic mortar pipe(Centrifugal casting process)is introduced to be as jacking pipe material used in the design and construction of one jack engineering project.
玻璃纤维增强塑料夹砂管(离心浇铸工艺)作为顶管管材运用于顶管工程中的设计、施工介绍。
With a practical project, authors state application status of the pipe jacking method in construction of contact tunnels of a subway shield zone tunnel.
从工程实例出发介绍顶管法在地铁盾构区间隧道联络通道施工中的应用情况。
应用推荐