The aseismic test of buried pipe crossing fault is conducted. Some m.
首次进行了跨断层埋地管道抗震试验。取得了一些有益的结论。
Pipe sticking phenomenon appears sometimes during pull-back stage of pipeline crossing with horizontally directional drilling, which results in crossing failure and great economic loss.
在水平定向钻穿越管道回拖环节中,容易出现卡管现象,导致穿越失败,造成巨大的经济损失。
This string of pipe may be very long, depending on the width of the crossing.
根据河流宽度,穿越管道可能很长,需要多根管段。
应用推荐