My question is, do unit test projects run under the VS process and if so, do these loaded assemblies pile up?
我的问题是,做单元测试项目运行在与过程,如果是这样的话,做这些加载的程序集堆起来呢?
Based on Quatarnary geology research and engineering evaluation for pile foundations, we have improved the method of Unit dividing and achieved considerable engineering effects.
现以第四纪地质研究为基础、以桩基工程评价需要为目的,改进了工作方法,获得较好的工程效果。
The study also goes to the influence, upon stress waves, of the piles relaxation time, the equivalent viscous damping coefficient of soil around the pile and the unit rigidity of soil below the pile.
同时,分析了桩身驰豫时间、桩侧土的等效粘滞阻尼系数、桩底土的单位刚度等因素对应力波的影响。
应用推荐