go top

pile testing

  • 试桩

专业释义

  • 试桩 - 引用次数:7

    Longitudinal vibration theory of pile is the basis of any kind of method in dynamic pile testing,which can be used to explain the dynamic reaction between pile and soil,the mechanics of pile testing,and to illustrate the pile testing curves.

    桩的纵向振动理论是各种动态试桩方法的理论基础,开展桩的纵向振动理论研究对于进一步弄清桩—土间动力相互作用、动力试桩的机理以及正确分析桩的测试曲线非常重要。

    参考来源 - 复杂土中桩的纵向振动理论及其应用

·2,447,543篇论文数据,部分数据来源于NoteExpress

双语例句

  • The O-cell pile testing (OPT) method is a new axial static load test of pile.

    平衡试桩一种新的荷载试桩方法

    youdao

  • During the pile testing of Guichi power plant's first stage engineering, various synthetical tests are engaged in.

    贵池发电厂首期工程试桩中,进行了多项目的综合性试验

    youdao

  • By analyzing the data of O-cell pile testing, new load transfer models before and after post grouting are proposed.

    通过分析自平衡试桩数据提出了注浆前后荷载传递函数模型

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定