pile installation technics 吊桩工艺
pile installation platform 桩基施工平台
mechanism of pile installation 挤土桩沉桩机理
Bearing upper load, a reinforced concrete structure with a pile foundation is the foundation of RH-TB vacuum recycling degassing installation.
TB真空循环脱气装置设备的基础是承载上部荷载的桩基承台钢筋混凝土结构。
An introduction is made on the construction process of artificial hole pile including holing, wall protection, fabrication and installation of reinforcing cage, pile core concrete grouting etc.
介绍人工挖孔桩的成孔、护壁、钢筋笼制作和安装、桩芯混凝土浇灌等施工过程。
The design, fabrication and installation of the steel casings and the problems to solve during the construction of the pile caps were summarized.
文章重点对钢套箱的设计制作、安装和施工中应注意的问题进行了总结。