open pier construction 空架式突堤结构
Pier construction sizing 桥墩建筑尺寸定位
round the pier construction 圆形墩柱施工
main pier foundation construction 主墩基础施工
pier and beam construction 梁柱结构系统
The related technology of bent cap of Crossed pier construction is introduced.
本文重点介绍十字墩盖梁施工的相关技术。
It suits to the vertical transportation and the ascending transporting of the warehouse, tower and bridge pier construction of railway and highway.
适用于建筑施工中物料的垂直运输和仓库、高塔以及铁、公路工程高大桥墩施工等固定场所的提升运输。
Climbing-frame is often used in the high-tower construction of cable-stayed or cable-suspended bridge, but seldom used in common pier construction.
爬架施工一般应用于斜拉桥或悬索桥的高塔塔柱施工,而很少用于一般墩身施工。
应用推荐