In the PERT network, a project is composed of many tasks.
在网络计划问题中,一项大的工程由许多工序合成。
With the help of computer simulation, the correctness of the nonnormal distribution of the PERT network has been verified.
并通过计算机模拟方法对PERT网络进行模拟计算。证明了偏态分布规律的正确性。
This algorithm provides the necessary technical support to the realization of the automatic drawing of the PERT network chart.
该算法为实现PERT网络图的自动绘制,提供了必要的技术支持。
应用推荐