加荷时间(period for loading) 将给定力级加到测力仪(或称重传感器)上所需的时间。 注:该时间的起点一般取测力仪的读数值开始上升一瞬间,其终点一般攘数...
基于24个网页-相关网页
Fatigue damage is the main destroy mode for the machinery parts and engineering structures under alternate loading over a long period of time.
对于那些长期经受交变载荷作用的机械零件和工程构件,疲劳破坏是一种主要的破坏模式。
The influence factors for removal efficiency sorting by priority are hydraulic loading period, the appending quantity of EM rejuvenation, soil depth.
影响各污染物去除效果因素的主次为,水力负荷周期、EM投加量,土层厚度。
This paper also presents a reduction factor of strength required for checking shock strength based on the test results of embedded elements under low period repeated loading.
文章还根据预埋件在低周反复荷载作用下的试验结果,提出了在进行抗震强度验算时所需的强度折减系数。
应用推荐