However, Contractor Equipment excludes Temporary works, Employer's Equipment (if any), Plant, Materials and any other things intended to form or forming part of the pavement works.
其中不包括临时工程、雇主的设备(如有时)、永久设备、材料和所有其它将构成或构成永久工程一部分的任何物品。
Those girls were cleaning the pavement (which was already perfectly clean). It's part of the collective works.
那些女孩子正在打扫人行道(其实已经够干净的了),这是集体劳动的一部份。
Finally, the article introduced continuously reinforced concrete pavement structural design methods according to the specific circumstances of the project physical works.
最后,根据论文依托项目实体工程的具体情况,介绍了连续配筋混凝土路面的结构设计方法。
应用推荐