The parallel transformer can exhibit controllable impedance under the control of power electronic converters.
通过电力电子变换器的控制,使得并联变压器呈现可控的阻抗。
Locate the Transformer stage and drag this icon to the parallel job pane.
找到Transformer阶段并将该图标拖放到并行作业面板。
The method to check short-circuit point between parallel conductors in transformer winding by Gaussmeter and to repair fault point are introduced.
介绍了运用高斯计来探查变压器绕组内并联导线间短路点,并对故障点进行修复的方法。
应用推荐