... Central Switch Panel 驾驶端的中央切换面板 servo cutout switch panel 伺服断路开关盘 overhead switch panel 舱预配电板 ...
基于4个网页-相关网页
overhead switch panel
架空开关面板
以上为机器翻译结果,长、整句建议使用 人工翻译 。
The initial FAA statement required the overhead switch panel wiring to be inspected and repaired if needed within 90 days.
CNN: 'There could have been an explosion'
应用推荐
模块上移
模块下移
不移动