The sluicing pump motor in No 2 ash pumphouse of Zhanjiang Power Plant experienced over temperature on its case during operation.
湛江发电厂2号灰渣泵房冲洗水泵电动机在运行中出现外壳温度过高现象。
The reasons of temperature rise of hearth sidewall for several times were analyzed and the operation practice on control of sidewall erosion was summarized for No. 2 BF at Baosteel.
通过分析宝钢2号高炉炉缸侧壁温度屡次升高的原因和操作实践的总结,证实铁水环流加剧是大型高炉炉缸侧壁侵蚀的主要原因。
That the temperature of thrust bearing pad exceeds the alarm temperature designed for unit No. 1 at Yele Hydropower Plant impedes the normal operation of the unit.
冶勒水电站1号机组在试运行过程中推力轴承瓦温超过设计的报警温度,无法继续运行。