The original design of valve plate to open the gas valve is hanging in the channel, the possession of an effective diameter about 20%.
而原设计阀板打开是悬于阀体的气体通道内,占有有效通径20%左右。
Should stand in the side entrance operation. First open water valve to send to the temperature reached e. reascularization gas. Ignite in and out of the oven gas rear can feed.
应站在入口的侧面进行操作。先打开水阀再送电,待炉温达到规定值再通入煤气。点燃进出炉口煤气后方可进料。
After turning off the gas or electricity open the drain valve at the tank bottom.
在关闭燃气或电源后可开启罐底的排水阀。
应用推荐