Open piping attached to a filled tank will not start to drip-leak following installation and test of a Chemtrol Tru-Bloc shut-off valve.
在Chemtrol Tru-Bloc关闭阀安装和测试后,连接到满储的储罐的管道开口将不会开始滴漏。
Freezing Weather Precaution - Subsequent to testing a piping system, valves should be in an open position to allow complete drainage.
结冰气候预防-检测管线系统后,阀门应该处于开启状态,做到排泄完全充分。
Keep return piping valve closed until trap fills with condensate. Slowly open valve.
保持回路管道阀门处于关闭状态直到疏水阀充满冷凝物为止。慢慢开启阀门。
应用推荐