The main conclusions are summarized as follows:1. The water temperature distribution of the typical level of years in the reservoir area based on Nuozhadu Hydropower Station is well simulated experimentally.
主要成果如下:1.试验对糯扎渡水电站典型平水年各月份库区水温分布进行了较好模拟。
参考来源 - 水电站进水口分层取水水温试验研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The construction of Nuozhadu Hydropower Station is large in construction scale with many environment impact factors and wide involving aspect.
糯扎渡水电站建设规模大,环境影响因素多且涉及面广。
The Nuozhadu Hydropower Station is huge in project scale and complex in engineering geological conditions and has weak tectonic zones on the right bank of its dam site.
糯扎渡水电站工程规模巨大、枢纽区工程地质条件复杂,坝址右岸分布有构造软弱岩带等。
The dam for the Nuozhadu Hydropower Station is located in an area with small valley coefficient, poor construction conditions and difficult arrangement of access roads to dam crest.
糯扎渡水电站大坝所处地段的河谷系数小,施工条件差,上坝道路布置困难。