The coordinate rotary method of nonlinear programming is described for solving the optimum section of the non-overflow concrete gravity dams.
本文阐述了采用非线性规划的坐标轮换法,作为求解混凝土非溢流实体重力坝最优剖面的方法;
Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.
万安水电站二期主体工程溢流坝6 ~ 15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。
应用推荐