ConstantNetInterchange (CNI) modehas been adopted in AGC systemofHunanPower pool. Controlledcapacityof generators unitshas been reached 20% of maximum of demand of Hunan pool.
The payment network charges the bank a very small transaction fee for using the network, but net they are essentially letting the bank make the most from the interchange fee, hence the banks are on the subsidy side.