The Katanga province alone, with its mining potential, needs 800 MW in addition to the 1,424 MW that it currently receives.
由于其采矿业的潜力,加丹加省自己就需要在目前已获得的1,424兆瓦的基础上再增加800兆瓦电力。
Texas led all states with 7,118 MW of total wind capacity installed, followed by Iowa (2791 MW) and California (2517 MW).
德克萨斯州以7118兆瓦的风电装机容量位列各州榜首,紧随其后的是爱荷华州(2791兆瓦)和加利福尼亚州(2517兆瓦)。
The output signals of two-color (MWIR and SWIR) infrared detectors with simultaneous mode are MW current signal and MW-SW current signal.
双色(中短波)同步工作模式的红外探测器,其输出光电流信号为中波信号和中短波混合信号。
应用推荐