Based on BAC algorithm, the optimization system of project network plan under multiple resource constraints is developed by Visual Basic 6.0. With the friendly input and output interface, to input, edit and assign activities and resources could be realized easily.
基于该算法利用VB6.0开发了多资源约束下的工程项目进度优化系统。