The construction of ash dam in Weishui Power Plant adopts the multi stage pulverized coal ash subdam technology.
微水电厂贮灰坝的施工采用了多级粉煤灰子坝技术。
Based on analytical method of construction mechanics, the simulative computational FEM formulations about multi-stage excavation of underground chamber are prescribed.
基于施工力学的分析方法,建立了地下洞室分期开挖仿真计算的有限元列式。
The current construction enterprises have entered a multi manufacturer competition stage. In order to maintain or improve profit-making ability, enterprises must accelerate their transformation.
建筑施工企业走到现在,已经进入多厂商完全市场竞争的阶段,企业要想继续维持或提高赢利能力,必须快速转型。
应用推荐