If PCPSP is expanded, considering a number of independent parallel projects as well as limited resources such as equipments, venues, human resources shared by those projects, a resource-constrained multi-project scheduling problem can be created.
如果进一步扩展RCPSP,考虑多个相互独立的并行项目,同时这些项目又共享设备、场地或人力等有限资源,就产生了资源约束下的多项目调度问题。
参考来源 - 基于活动成本目标的资源受限多项目进度计划·2,447,543篇论文数据,部分数据来源于NoteExpress
Combined with method based on order and serial schedule generation scheme and multi-project task list, the gotten scheduling scheme can meet the project schedule constraints of precedence relations.
采用基于排列的方法和串行项目进度生成机制,结合多项目的任务列表,可以保证所得调度方案满足项目优先关系约束。
Then the optimization models of multi-mode project payment scheduling problems(MPPSP) are constructed from the contractor's and the client's viewpoints respectively.
随后分别从承包商和业主各自的角度构建了多模式项目支付进度的优化模型;
Resource Allocation and Multi - Project Scheduling?
资源分配与多计划调度RAMPS ?