BP says a more complete solution is needed. The next step is to try to pump mud and other materials to the sea floor and block the well.
VOA: standard.2010.05.17
The solutions for -- the solution with the top kill, first in stabilizing the well with heavy drilling mud, ultimately would lead to the cement capping of that well.