·2,447,543篇论文数据,部分数据来源于NoteExpress
Through this high pressure line, mud is pumped in to the standpipe and drill pipe.
通过这根高压管线,泥浆被泵入立管和钻忏杆。
youdao
Before making mud, clean all the circulation pipe-line and mud pits.
配浆前要认真清洗循环管线和配浆池。
应用推荐
模块上移
模块下移
不移动