We worked with the contractor for the MRT system.
我们与MRT 系统的合同商合作。
The construction of the water-proofing layers is the last step of the construction of the elevated bridges of MRT system.
防水层施工是城市轨道交通高架桥梁的最后一道施工工序,其设计、施工质量关系到高架桥梁的耐久性和使用安全。
The expansion of the MRT system has also made it easy for people who live outside of the downtown area to stay there after work or to come in from the suburbs for food, shopping, and leisure.
而捷运系统的扩张也使得不是住在市区的人们在下班后要前往市区或是从郊区到市区吃东西、逛街和从事休闲活动都变得更方便了。
应用推荐