A description is given to method and technology adopted against track deviation during construction of elastic monolithic track bed in long double line tunnel.
针对长大铁路双线隧道轨道结构施工中发生的弹性整体道床轨道偏移问题,阐述了纠偏的方法和施工工艺,为以后同类工程提供借鉴。
The long line transmission technology of two-way parallel interface bus of monolithic compnters is analysed and discussed. Solutions are given, which have high value in engineering applications.
本文针对单片机双向并行接口总线的长线传输技术进行了分析和讨论,并给出了解决方案,具有较高的工程实用价值。
The platform and the construction technology for full-circular monolithic lining are studied.
对单线铁路隧道全环整体模筑衬砌台车和施工工艺进行了研究。
应用推荐