Permeable reactive barrier (PRB) is a new technical type for in situ remediation of contaminated soil and groundwater, and is composed of injection well, extraction well and monitoring well.
PRB技术是一类就地修复污染土壤及地下水的新型技术 ,主要由注入井、浸提井和监测井3部分所组成。
参考来源 - 污染土壤及地下水修复的PRB技术及展望·2,447,543篇论文数据,部分数据来源于NoteExpress
The meaning and objective for layout monitoring well and how to lay well are discussed, the monitoring and configuration of monitoring well are introduced as well.
讨论了地浸采铀中布置监测井的意义、目的和如何布置监测井。同时,还介绍了监测内容及监测井的结构。
This system can complete the dam monitoring well, can really reflect the operation situation of project, and provides reliable guarantee for safety operation of reservoir.
该系统能较好地完成水库大坝监测,能如实反映工程内部运行情况,为水库安全运行提供可靠保障。
The technology of monitoring well bottom while drilling has high precision, which can control borehole pressure more precise, but also the scope of the pressure gradient is well established.
井下随钻流量监测技术具有很高的监测精度,能够对井眼压力进行更加精细的控制,还能够对压力梯度范围很好的确定。
应用推荐