This paper presents the turbine model acceptance test and the test results of Feilaixia hydropower station.
简要介绍了飞来峡水电站水轮机的模型验收试验的情况及结果。
Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.
岩滩水电站水轮机性能采用模型验收试验方式验收。其全模拟模型最高效率达到92%。
应用推荐