For effective drainage therefore, the entire site should be located above flood level at a minimum of 3 m above the water table, preferably on a gently sloping area.
因此需要注意,为了保证有效的排水,整个地点应当高过洪水水位、高于地下水位至少3米,最好是在地势略微倾斜的地区。
Accordingly, the accident of tailings dam break during flood season is studied by applying fault tree analysis that includes minimum cut sets, minimum path sets and structure importance.
应用事故树分析中的最小割集、最小径集及结构重要度,对汛期尾矿坝溃坝事故进行了研究。
Flood protection measures under the same flood prevention criteria may be optimistically selected by the criteria of minimum yearly cost.
对满足同一防洪标准的各种防洪措施,也可用年费用最小的原则优选。
应用推荐