The aging of the hot air curtain line and the improper connection method of the electric wire is the biggest hidden trouble of the accident.
热风幕线路的老化及电线的连接方法不当是造成事故的最大隐患。
Shaking table test method research on architectural curtain wall.
建筑幕墙振动台试验方法研究。
Curtain grouting method and corresponding measures are introduced to deal with gushing water and gushing mud during construction of Geleshan Tunnel.
介绍歌乐山隧道施工过程中出现的涌水、涌泥情况,帷幕注浆堵水的施工方法及相应措施。
应用推荐