Examine the pressure meter tube and valve, pressure meter cover glass, if it is dirty, clean it with diluted hydrochloric acid.
检查压力表管道及阀门是否畅通,灵活,压力表面玻璃如有污,可用稀盐酸拭净。
Use a meter, the first cover to tighten slightly in the direction of twist, to loosen the direction of twist.
使用开表器时,可先将后盖向旋紧的方向稍微拧一下,再向旋松的方向拧。
Solar panels cover the entire front face of the sprawling eight-story headquarters. Nearly 2, 600 two-meter-long panels form the largest grid-connected solar façade in the world.
尚德电力八层楼的总部大楼的正面全部由太阳能板覆盖,由约2600块2米长的面板组成的建筑物是世界上最大的用于建筑物表面的发电太阳能,在房顶还有一排1800块较小的太阳能板,仅有阳光的一天,就能产生一百万瓦特的电力。
应用推荐