The axial load and centralizer spacing from the bottom to the top are calculated by using the mechanical analysis method and the log data.
采用力学分析的方法,结合测井资料,由下到上计算了抽油杆柱的扶正器间距和轴向力。
The mechanical or electrical displacement of a curve on a well log by a logging engineer during a wireline survey.
在测井过程中,测井工程师对所测量的曲线作机械性移动或者电移动。
With the measured P and S wave velocities and log-derived densities of the same interval, rock mechanical parameters of this pre-borehole are roughly calculated.
提取出其中的纵波、横波速度信息,并与实验室岩心声波测量结果和测井结果进行了对比。
应用推荐