Pertinent measures of temperature control and crack prevention are suggested, settling the practice problems in projects.
并针对性地提出了相应的温控防裂措施,以解决工程实际问题。
This article analyses process principle of mp absorber after revamping, and presents the preventive measures for control of mp absorber temperature during its startup.
通过对中压吸收塔改造后的工艺原理分析,提出在开车过程中中压吸收塔温度控制的预防措施。
Started from the analysis of gate concrete temperature control, the paper made a brief study on temperature control methods and construction control measures in the process of construction.
为解决这一难题,本文从水闸混凝土温度控制问题的分析入手,对水闸混凝土施工过程中的温控方法和施工控制措施进行了简要探究。
应用推荐