In this paper, a quadratic programming algorithm is presented to solve Max-cut problem.
本文给出了最大割问题的二次规划算法。
The paper set up a model of hydro unit maintenance , whose object is the max income in the life period of unit, considering the economic factors of the power market and restrictions of hydro units.
本论文建立了水电机组最优检修间隔模型,以机组在寿命期内的收益最大为目标函数,考虑了电力市场的经济因素和水电机组的约束条件。
This paper simply introduces a ruby laser with max. relative error of output energy< 2% and it's features about construction.
本文简介一种输出能量最大相对误差小于2%的红宝石激光器及其结构特点。
应用推荐