Ensures all material requirements are sufficient for production schedules.
确保所有供应的物料能够满足生产计划的需求。
Runed Orbs: Recipes which require this item have had their material requirements significantly reduced.
需要这个物品的配方减少了需要此物品的数量。
Coordinates production scheduling, quality control, labor requirements, material requirements, and finished goods inventory.
协调排产,质量控制,劳动力需求,物料需求和成品库存。
应用推荐