According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
The master production scheduling(MPS) problem of hot rolling seamless steel tube is formulated as a mixed integer linear programming model.
建立了热轧无缝钢管主生产计划问题的混合整数线性规划模型。
Update and maintain the Master Production Schedule as changes are identified in order for the MRP to reflect accurate, up-to-date information.
更新和维护主生产计划确定的变化,以便使MRP准确反映最新的信息。
应用推荐