The development and enforcement of the guidelines is the Shared responsibility of the process engineers and should be consistent with the master test plan.
指南的开发和执行是过程工程师们的共有责任,并且应当是与主测试计划是一致的。
Further conceptualization and design development of the master plan will be required prior to implementation of the vision.
但在实施本景观设计之前,总体规划还需要作进一步的概念化和设计完善。
More importantly, this paper emphasizes analyzing and designing new plan on the points of master producing plan, product development, assembly quality, assembly spot control, assembly technique.
本论文研究的重点是从主生产计划、产品开发、总装质量、总装现场调度、总装工艺的角度分析和策划了新的总装流程方案。
应用推荐