John Fleming will depart on Aug. 1, Wal-Mart said today in a regulatory filing.
在今天发布的一份管理声明中称,约翰弗莱明(John Fleming),作为执行副总裁,将于8月1日这家位于阿肯色州本顿维尔的公司。
When covered in solar panels, that acreage would generate 600 to 1, 000 megawatts of electricity. One megawatt is enough to power a Wal-Mart Supercenter.
这些土地装好太阳能板之后将可以生产600到1000 MW的电力,而1mw电力足够给一个沃尔玛超市供电。
By 1:00 a.m., hundreds had gathered in front of the Wal-Mart at Long Island's Green Acres Mall.
到凌晨1点,已经有数百人聚集在美国长岛绿田购物中心的沃尔玛商场门前。
应用推荐