automatic marshalling station 自动化编组站
network marshalling station 路网性编组站
hump marshalling station [铁路] 驼峰编组站
Phase plan, which is the main part of the task in marshalling station has obvious shortcoming in its obtaining way by the means of traditional method.
阶段计划是编组站作业计划的核心部分,传统手工编制方法的弊端日趋明显。
参考来源 - 编组站阶段计划编制系统设计与若干技术的研究How to solve present problems of the marshalling station and the central role of plan's auto-generation are explained.
对SAM如何解决编组站现存的问题,计划自动编制在SAM中的核心作用进行了阐述。
参考来源 - 摘挂列车编组钩计划自动编制研究和实现·2,447,543篇论文数据,部分数据来源于NoteExpress
How to select the favorable scheme out of a large number of break-up schemes is the core of the dynamic wagon-flow allocating problem for a marshalling station.
如何从众多的解体方案中选择有利方案,这是编组站动态配流所要解决的核心问题。
Wagon-flow allocation is indispensable contents in the stage plan in a marshalling station.
配流是编组站阶段计划不可缺少的内容。
The core of the phase plan of a marshalling station is to identify the source of the flow of departure trains.
在编制编组站阶段计划时需解决的一个核心问题是确定出发列车的车流来源。
应用推荐