Based ongeneralizedrun-offtriangle, weintroduce multiplicativemodeland its marginal-sumestimationinchapter2. We get that themarginal-sum estimation is the chainladder estimation.
This is usually said to be, a rule of thumb, about 20% of the sum collected or, in another formulation, perhaps 35% of the marginal revenue of the system.