人力派遣计划(MANPOWER SCHEDULE)人力派遣计划实际上就是施工进程度计划的人工表现人力派遣计划要按照总包商的工程进程度计划安排制定劳务分包商应有效合理地组织...
基于24个网页-相关网页
Manpower arrangement schedule 劳动力安排计划表
According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
Planner will arrange pilot run schedule based on manpower and material, will coordinate with MFG to finish pilot on time.
计划根据生产耳目力,物料环境安排试产,并跟催生产的进度。
应用推荐