These processes should include reviews of project-level risks with negative implications for the portfolio, ensuring that the project manager has a responsible risk mitigation plan.
这些过程应当包括针对组合在项目层次上的风险的负面影响进行评审,以保证项目经理拥有一个可靠的风险降低计划。
The job is said to have the risk profile of a short option position with unlimited downside and limited upside-something every good risk manager should avoid.
这份职业本身的风险特征就像空头期权(头寸)一样,正回报有限,负回报(即损失)无限,这是每一个优秀的风险经理人都应尽量避免的。
What is certain is that the world's largest insurer was abruptly separated from the world's most experienced risk manager at the worst possible moment.
最终,这家世界上最大的保险商在最糟糕的时刻抛弃了世界上最有经验的风险经理人。
应用推荐