A substation is on the territory of the GRES-1. Its main task is to distribute the electric power produced by the station.
在GRES - 1内建有一个变电站,它的主要任务是配送发电厂的电能。
Distribution and capacity of the traction substation facility shall satisfy the requirement of the velocity aim traffic volume marshalling and running interval of main line.
牵引变电站设施的分布与容量应满足干线的速度目标、交通量、编组以及运行间隔要求。
As the hinge of electric power, the mine substation is one of the main objects that the safe production takes charge of.
矿井变电所作为井下各分采场的电力枢纽,是安全生产监管的主要对象之一。
应用推荐