After full consideration of the capacity improvement by the post construction reinforcement, the design of the main pile can reduce the requirements of the capacity.
在充分考虑工后加固承载力将提高的情况下,进行主体桩的设计,从而可以降低对加固前主体桩承载力的要求。
The compacted multi-branch bearing disk concrete bored pile is a new type of concrete pile with varied sections, which is composed of the main pile, branch pile, branch support and the bearing disk.
挤扩多分支承力盘混凝土灌注桩是一种新型的变截面混凝土灌注桩,由主桩、分支桩、分支和承力盘组成。
If, by contrast, everything was in a pile on the main floor, it would significantly reduce the usefulness of the library by making the search for materials virtually impossible.
如果采用相反的方式,将所有的东西都堆在一个大房间里,由于几乎不能进行资料搜索,因此会大幅度降低图书馆的有用性。
应用推荐