The requisition of improving the air clearance accurancy in the large scale synchronous machine erection and changing configure method are presented.
分析了泵站运行中常见的机组功率相差较大的原因,明确提出需要提高大型同步电机空气间隙安装精度和改变安装方法。
The second chapter presents the content and characteristic of metallurgy project. It mainly elucidates iron smelting system , steel smelting system and continuous casting system for machine erection .
第二章介绍了冶金工程项目的内容和特点,主要阐述炼铁系统、炼钢系统以及连铸系统设备安装的主要内容。
The dynamical date is the key factor in the design of Bridge Erection Machine and so on.
架桥机等起重设备的工作动态特性参数是进行此类设备设计的关键因素之一。
应用推荐