Lubuge Shuidianzhan鲁布革水电站(Lubuge Hydropower Station) 位于中国云南省罗平县与贵州省兴义市交界、珠江水系南盘江的支流黄泥河上,为混合式水电站。鲁布革水电站以.
基于18个网页-相关网页
The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing.
鲁布革水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库的任务,是最重要的泄洪、排沙通道。
The calculation and analysis of the core type rockfill dam of Lubuge Hydropower Station are conducted by the programs of total stress method and effective stress method.
鲁布革水电站心墙堆石坝采用总应力法和有效应力法计算程序进行计算和分析。
This paper presents a design example of using a cable crane for lifting and erecting an access bridge for the right bank spillway tunnel for the Lubuge Hydropower Station.
这里介绍了应用于鲁布革右岸泄洪洞交通桥吊装的缆索起重机的设计实例。
应用推荐