A lower cost of capital, for instance, fuels the pace of construction.
比如,更低的资本成本加快了建设速度。
However, at lower discount rate and heavy traffic flow the initial cost of construction is in essence irrelevant.
然而,在折限率较低与交通量大的情况下,从本质上讲,与建设的最初成本没有关系。
The anchor support is a effective method for reinforcing failure rock slope with technic feasibility, construction convenience and lower cost.
锚杆支护是加固失稳岩质边坡的有效方法,其技术可行,施工方便,工程费用较低。
应用推荐