...美元的合同的初期资金,进行不循环工程(non-recurring engineering)和用于三个航天器及相关控制设备的先进长引线(long-lead)材料。如果该.
基于1个网页-相关网页
long lead 分立式引线 ; 长引线
Long Lead Procurement 提前时间最长的采购
Long Lead Items 提前时间最长的事项
long lead screw 长丝杠
Long lead time 时间长 ; 长前置时间
long lead time item list 长前置时间项目清册
long-lead materials contract 长周期生产器材
Long-lead material 长期材料
Long lead item list 需要长时作业项目表
The advance procurement contract enables Boeing to obtain long-lead materials for the satellite.
先期采办合同使波音公司能够获得卫星的长期主导原料。
And it takes not just lots of money but long lead times.
它不仅需要大笔的钱,而且还需要很长的运作周期。
Given the long lead time for technology development, research, development, and demonstration need to ramp up now.
鉴于技术开发需要较长的周期,现在就需要加大研发和示范力度。
They offer long-term evidence that it can lead to improvements in education,work and health.
VOA: special.2010.03.04
Over the past few decades,however, scientists have determined that even trace amounts of lead in children's bodies leads to long-term neurological and behavioral problems.
VOA: standard.2009.12.19
应用推荐