The existing link connection mode planning is a re-optimization of the tie lines based on radial lines, making local defects inevitable.
现有的有关联络接线的规划都是在已完成辐射线路布局的基础上进行的联络线再优化,这样就不可避免地存在局部性的缺点。
Each and every idle loss ratio has been checked against actual measurement for accuracy and effectiveness in identifying local defects in windings and cores of transformers.
并结合实际测量数据,详细分析了单相空载损耗比对发现变压器线圈和铁心局部缺陷的准确性和有效性。
Then some defects such as slow convergence rate and getting into local minimum in BP algorithm are pointed out, and the root of the defects is presented.
分析了BP算法的基本原理,指出了BP算法具有收敛速度慢、易陷入局部极小点等缺陷以及这些缺陷产生的根源。
应用推荐