Apply150% rated load at rated power factor and measure the time required for the inverter protective devices to operate.
在额定功率因素上施加150%额定负荷,并测量逆变器保护装置启动所需时间。
The result indicates that the maximum of dynamical stress intensity factor arrives behind the load time and increases with the size of thick wall cylinder.
结果表明动态应力强度因子的最大值在加载时间上有滞后性现象,它的最大值随厚壁筒尺寸增加而增加。
The hourly average daily generation curve is used to express the wind farm operation constraint and the load changes over time are reflected through the scaling factor.
该模型中通过比例因子来反映负荷随时间的变化,采用日平均发电曲线表示风电场的运行约束。
应用推荐