load modification method 载荷修正法
For this article, we'll convert the code to use a load-time modification approach, and to support pattern-matching for specifying the classes and methods to be timed.
对于本文,我们将把代码转换为使用加载时修改方法,并将它转换为可支持模式匹配,用以指定要定时的类和方法。
This modification caused a heavy "pulse" of load on the server, which made it easier to measure the time it took for resultant replications.
修改之后会给服务器带来较大的“负载冲击”,这有利于测量完成最终复制所需的时间。
Review of the results will be performed by a Design engineer and decisions regarding modification to standard load group loadings will be determined by the PSG Engineering Director.
设计工程师负责对分析结果进行评审。按照标准载荷组载荷要求,对载荷进行调整的相关事宜,由管架集团工程总监作出最终决定。
应用推荐